Project Overview
We began with soft-strip demolition and the removal of the existing structure in the areas scheduled for extension, using our BROKK fleet and demolition excavators. Groundworks followed, including installation of a new gutter and waste pipe system for the building.
A crane was then erected, as shown in the above image, to assist with the installation of new steelwork for the extension and with the construction of the composite metal decks and concrete floors. The installed steels were then intumescent painted to achieve a fire rating of 90 minutes.
Scope of work:
- Soft strip & demolition
- Fabrication and installation of new steels to support new structure & Intumescent painting of new steels
- Composite metal decks & concrete floors